112

112

Tier 8 · china · heavy
Premium
About
The development of the 112 tank started in 1962. The project was to feature parts and components of medium and heavy tanks. Existed only in blueprints. The 113 tank was a further development of the 112.
Survivability
Hit points
1,500
View range
380 m
Signal range
600 m
Engine fire chance
12%
Armor (mm)
Front
Sides
Rear
Hull
120
120
60
Turret
240
130
60
Gun · 122 mm D-25TA
Caliber
122 mm
Rate of fire
4.55 rpm
Reload
13.2 s
Aim time
2.8 s
Dispersion @ 100 m
0.44 m
Gun arc
6° / 17°
Traverse
26°/s
Ammo
45
Mobility
Top speed
45 km/h
Reverse
15 km/h
Engine
580 hp
Power/weight
12.6 hp/t
Hull traverse
26°/s
Turret traverse
26°/s
Shells
ARMOR_PIERCING
390 dmg (293488)
175 mm pen (131219)
HOLLOW_CHARGE
390 dmg (293488)
250 mm pen (188313)
HIGH_EXPLOSIVE
530 dmg (398663)
61 mm pen (4676)
Marks of Excellence

Not enough data for this tank yet.